«Back to
Projects Q-Z
Skogies Automated Car Wash - Kelowna, BC
  • Automated Car wash to 140 foot tunnel with skylights
    • Lower section of wall panels are 12 1/2" Waffle-crete and upper was 12 1/2" True Sandwich;
    • Column-like panels had 4" extra thickness on top of panels;
    • Lower panels had Parapet cast into skinside of the panels to allow for roof panels that were cast as 12" Waffle-crete;
    • Roof slabs over the automated section are 12" Waffle-crete c/w openings cast-in for skylights;
    • Each of the panels and roof slabs had electrical and mechanical openings cast-in
  • Coin-op wand wash area
  • Express Stop grocery area.
Exterior walls for Automated carwash section are going up
Big openings head into Express stop area and are viewing areas for customers waiting for their vehicles
View showing roof panels
Adding Landscaping - making panels look like they belong
One of the first vehicles through the brand new car wash


Jump to Coin-Op Pics

Jump to Express Stop Pics
«Back to Projects Q-Z



If you would like more information on this or any of our projects, or if you are planning an endeavour please contact us:


Email: general@advanceprecast.com

or

Phone: 250.765.1431 (ask for Wayne Rains)




   © Copyright 2011 Advance Precast Ltd.