«Back to
Projects Q-Z
Skogies Express Stop - Kelowna, BC
  • 2,400 sq. foot convenience store attached to Carwash
    • Peaked panels and lintels from one peaked back to the other peaked were the only part that were precast
    • Lintels support the roof structure.
    • Panels show weld plates for canopy
Peaked panels getting installed. There are 3 panels installed
Panels installed. Building on left hand side is the Automated Carwash panels.Brown colored part is NOT precast.

A little further along
Finished panels
with sign attached


Jump to Coin-Op Pics

Jump to Automated Carwash

«Back to Projects Q-Z


If you would like more information on this or any of our projects, or if you are planning an endeavour please contact us:


Email: general@advanceprecast.com

or

Phone: 250.765.1431 (ask for Wayne Rains)





   © Copyright 2011 Advance Precast Ltd.