Mara Lake Water Treatment Plant
Located in Mara Lake, BC
Cast in 2015.
General Contractor: Maple Reindeers Inc.
Architect: OPUS Daytonknight
Structural: OPUS Daytonknight
Precast Structural: Force Engineering Group Inc.
Precast Designer(s): Ilonka Kern
APL Job #:968
Special Deck form-liner with Deckside reveals
Cast-in door frames
Exterior panels 14" True at 27'-8" tall
Interior panels 6" [152mm] solid with smooth finish
Embedded electrical