Rogers Trucking
Located in Fort St. John, BC
Cast in 2013.
General Contractor: WL Construction Ltd.
Architect: W.R.K Architect
Structural: Force Engineering Group Inc.
Precast Structural: Force Engineering Group Inc.
Precast Designer(s): Ilonka Kern
APL Job #:937
12.5" True Sandwich panels
Columns
Deckside reveals
Exterior panels 12.5" [318mm] Hybrid [31'-6" tall] True Sandwich with smooth form finish and deckside reveals.
Interior panels 8" [203mm] Solid with smooth finish